Turbine rotor remanufacture
Reverse-engineered and re-forged a discontinued turbine rotor, returning a 90 MW unit to service six weeks ahead of the OEM lead time.
A sample of the assets we have forged, fabricated, installed, and kept running for operators who cannot afford to stop.
Reverse-engineered and re-forged a discontinued turbine rotor, returning a 90 MW unit to service six weeks ahead of the OEM lead time.
Designed, fabricated, and stamped a skid-mounted reactor vessel package, installed and commissioned during a single planned shutdown.
Overhauled and laser-aligned a primary mill drivetrain, cutting vibration by 70% and ending a recurring bearing-failure cycle.
Turnkey install of a 1.2 km conveyor and transfer-tower system, delivered on schedule with zero lost-time incidents.
Tell us the asset, the tolerance, and the deadline. We will tell you what it takes to build, install, and keep it running.